Netcare CBMH ‘The Link’

Foreshore, Cape Town, South Africa

This Netcare project includes the design, construction and fit out of 6 floors of the old “Chevron Building”, which links into the new Christiaan Barnard Memorial Hospital.

Client:
Netcare Hospital Group / Netcare Property Holdings

Consultants:
Netcare Hospital Group, Metrum Project Managers, BSM Architects, MBH Architects, MWSQS's, BFBA Elec, Spoormaker & Partners Mech Engineers, Chimera Fire, Ekcon Engineers

Value:
R 300 million

Size:
12 000 - 18 000 sq.m

Dates:
February 2017 to April 2019

Description:

The project includes the fit out of 6 floors of the old “Chevron Building”, which links into the new Christiaan Barnard Memorial Hospital.

Six floors in building is to be fit out to accommodate the following:

  • 2 Theatre, 20 bed Day Theatre (Medicross)
  • 36-bed Subacute step down (Medicross)
  • Medicross Clinic
  • NRC (National Renal Care)
  • Doctors’ suites
  • Physiotherapist
  • Three pathology labs
  • 3 Theatre, 24 bed Day Theatre (Medicross)
  • 30 bed + 15 future bed Psychotherapy Ward

Professional Team:

    Metrum